Half a day or two days: the two jobs compared
How long a VELUX installation takes depends first on whether the roof already has a hole in the right place. Everything else changes the timetable by hours, not days.
A replacement keeps the rafters, the lining and usually the plaster just as they are. The fitter lifts out the old sash, unscrews the frame, takes off the old flashing and fits the new window and flashing into the same gap. A new opening means cutting into the ceiling, taking out insulation, opening the roof covering, and often cutting and trimming a rafter before the window can even be offered up. The table below sets out typical times on site for a single window on an ordinary tiled roof in the Cambridge area.
| Job | Typical time on site | Inside finish |
|---|---|---|
| Same-size swap | About 4 hours | Existing lining kept |
| Swap to a bigger size | 1 day | New lining, some plaster |
| New window, between rafters | 1 day | New lining and plaster |
| New window, rafter trimmed | 1 to 2 days | New lining and plaster |
Those are working hours with the roof open for part of them, not the whole project. A second window in the same room adds a few hours rather than doubling the time, because the scaffold or ladders, dust sheets and tools are already in place.
Where four hours go on a same-size swap
A straight swap is quick because nothing structural moves and the room keeps its finished lining. The time goes almost entirely on the roof covering around the frame.
The first half hour is dust sheets, taking down any blind and removing the old sash. The old frame comes out next, along with the flashing and the ring of tiles or slates closest to it. Then the new frame is fixed to the rafters with its brackets, the underfelt collar and insulation collar go round it, and the new flashing is built up piece by piece from the bottom. The tiles are relaid, the sash goes back in, and the window is opened and closed a few times to check it runs true.
On older windows, the part that sets the pace is matching the depth of the new frame to the old lining. Windows made before 2001 sat at a different depth, and a replacement flashing designed for them lets the new window keep the old lining untouched. Our guide to identifying your VELUX window generation explains how to tell which you have, and whether it is a straight swap is covered in will a new VELUX fit my old opening.
Why a new opening runs into a second day
Most of the extra time on a new window is inside the room, not on the roof. Cutting the roof and weathering the frame is a single morning; building a lining that throws the light into the room takes longer.
Once the roof is opened, the rafters decide the pace. If the window sits between two rafters, the frame goes straight in. If it is wider than the gap, one rafter is cut and trimmed with new timbers above and below, which is structural work and needs the Building Control notification. After the roof is weathered and watertight, the inside begins: insulation packed round the frame, a vapour barrier collar, then new lining boards. We splay the lining where the room allows, with the top angled up and the bottom angled down, because a splayed reveal spreads daylight much further across the ceiling and floor than a square one. That work, plus the plaster skim, is what usually pushes a new window into a second day. The full sequence is set out in the VELUX window installation process.
What adds hours, and what does not
A handful of things add real time to the fitting day. Others sound as if they would, but make little difference.
- Slate and plain tiles. Small-unit coverings, common on Victorian terraces in Romsey and Petersfield, take longer to cut in and relay than large concrete interlocking tiles.
- Combinations and balconies. Stacked or side-by-side windows, and a CABRIO balcony, need combination flashings and more trimming, and are closer to two days than one.
- Access. A window that can be fitted from inside needs no scaffold. A high three-storey slope, a chimney beside the frame or a low pitch may call for a tower or scaffold, which is put up before the fitting day.
- Electric windows. A mains INTEGRA window needs a supply run to the frame by an electrician; a solar version needs no wiring and adds very little time.
- Blinds. Clip-in blinds take minutes each, so they do not change the day.
Weather is the one factor no one controls. Heavy rain or strong wind stops the roof being opened, so the fitter either starts early and finishes before it arrives or moves the day. A roof is never left open overnight.
The weeks either side of the fitting day
The hours on site are the short part. The survey, the light plan and the window's delivery set the calendar, and the decorating comes after.
A light survey takes about an hour in your home. The written quote and light plan follow, setting out position, size, glass and shading. Standard VELUX sizes and flashings are usually available within days; less common sizes, colours or conservation windows can take longer to arrive. Where the work is notifiable, the Building Control notification is handled for you and runs alongside this, not after it. Once the window is in, fresh plaster needs time to dry before it is painted, which depends on the thickness of the skim and the season. If you are weighing up the whole project, our VELUX window installation page covers range, glass and guarantee, and the costs page explains what drives the price.
Questions people also ask
Can a VELUX window be fitted in one day?
Yes, in many cases. A same-size swap takes about four hours, and a new window that sits between existing rafters can be fitted, lined and skimmed within one working day. A trimmed rafter, a combination or a large balcony window is more likely to need two.
Do I need to be at home during the installation?
Someone needs to let the fitter in and be available to agree the exact position before the ceiling is cut, since that is when the light plan becomes a real opening. After that you can go about your day in the rest of the house.
How long before I can use the room again?
After a swap, straight away once the dust sheets are lifted. After a new opening, the room is usable that evening, although the fresh plaster round the lining needs to dry out before it is painted.
Does fitting the window myself save time?
Rarely. An experienced fitter works to a routine that a first-time installer cannot match, and the notification duty still applies. Our answer on fitting a VELUX window yourself covers what is involved. When you are ready, book a light survey.