How a roof window goes in from the room below
The whole unit, from the frame to the flashing, is built to be handled by someone standing inside and working out through the hole they have just made.
The job starts with the lining. Inside the room, the plasterboard or lath and plaster is cut back to the size of the new opening, and the insulation behind it is taken out. From there the fitter cuts through the membrane or old sarking felt and lifts off the tiles or slates over the opening and a margin around it, passing them down inside rather than dropping them off the roof. The battens are cut to line, and the rafters are either left as they are, where the window fits between them, or cut and trimmed, where it does not. Our guide to trimming rafters for a roof window covers what that means for the structure.
The sash is then taken out of the frame, which makes the frame light enough to lift up through the gap and screw to the rafters with its brackets. A collar of underlay goes round the frame to lead any water that gets past the tiles back onto the roof. The flashing kit follows, piece by piece from the bottom up, and the tiles or slates are laid back around it. Last of all the sash goes back in, and the fitter can close it from inside and look at the finished weathering from the room.
- Rafter beside the opening, with insulation between the rafters.
- Trimmers across the rafters above and below the window, set back so they sit clear of the splayed lining.
- Battens and breathable underlay, the underlay turned up around the frame.
- Slates or tiles, cut and re-laid around the window.
- Flashing kit: an apron dressed over the slates below the window, and a head flashing tucked under the slates above.
- Insulation collar packed around the frame so the cold bridge at the opening is closed.
- Vapour control layer lapped to the frame with a collar, keeping warm, moist room air out of the roof.
- Lining: level at the head and plumb at the sill, so the opening widens into the room and throws more light down.
- Roof window: frame, sash and a sealed glazed unit, sitting a little above the slates in a standard fitting.
For someone at the head of a pair of steps, head and shoulders out through the frame, that sequence is comfortable on an ordinary tiled slope. It is also quicker than setting up on the roof, and it leaves the street side of the house untouched. If you want to see how the flashing pieces lap over each other, our guide to roof window flashings goes through each kit.
What can be reached through the opening
Everything within about an arm's length of the frame can be done from inside, so the question on any roof is how far the work spreads beyond that.
On plain clay tiles and concrete interlocking tiles, the disturbance is small. Tiles hang on battens by nibs, and only a few courses either side and above need lifting before they are cut and laid back round the flashing. That work sits well within reach, so a single roof window on a 1930s semi in Cherry Hinton or a newer house at Trumpington Meadows can normally be fitted entirely from the room.
Slate is different. The Welsh slate on many Victorian terraces in Romsey and Petersfield is nailed, not hung, so each slate around the opening has to be freed with a slate ripper and later fixed back with a metal tingle. The area to strip is wider, and the courses furthest from the frame can end up outside comfortable reach. Our answer on fitting a roof window in a slate roof explains why.
The other limit is the floor. If the sill of the new window sits more than a stepladder's height above the boards, as it can in a tall room opened to the rafters, the fitter needs a platform or tower inside to get to the frame at all. That is still inside work, but it needs planning. Roof windows in vaulted ceilings covers how high those windows usually go.
When outside access is still needed
Some roofs and some window layouts push part of the work beyond reach, and then a roof ladder, tower or scaffold is added for that part only.
| Situation | From inside? | What is added |
|---|---|---|
| Single window, tiled roof | Yes | Nothing |
| Single window, nailed slate | Often | Roof ladder if the strip is wide |
| Two or more windows together | Partly | Tower or scaffold |
| Pitch near the minimum | Partly | Access to check the laps |
| Near a chimney or valley | Partly | Access for the lead |
Combinations are the clearest case. When two or three frames are set side by side or stacked, the flashing runs across a width no one can cover from a single opening, and the tiling between frames has to be set out as a whole. Our guide to roof window combinations shows the layouts. Low pitches are another: on a shallow slope the weathering around the frame needs more care, so being able to see it from outside matters. The limits are set out in our guide to roof windows for low-pitch roofs.
Where a new window sits close to a chimney stack, an abutment or a valley, lead may need dressing well away from the frame, and that is outside work. So is any roof where the covering is old enough that stripping it from below would disturb more than it should. The access options for each case, from a roof ladder to full scaffolding, are set out in our answer on whether you need scaffolding to fit a roof window.
What it means inside the house
Fitting from inside moves the mess indoors for a day, but it also means the position is chosen from where the light will actually be used.
Expect dust sheets from the door of the room to the opening, and some debris from the lining and the old felt. A like-for-like swap of an existing roof window can take about half a day; a new window with trimming and a finished internal lining typically takes one to two days. The new lining, with its reveals boarded and ideally splayed so light spreads further across the room, is part of the same job. A new roof window changes the thermal envelope and the structure, so Building Control is involved; our answer on whether roof windows need building regulations explains how that works, and we handle the notification where the work is notifiable.
There is a quieter advantage too. Because the opening is marked out from the room, the fitter and the homeowner can stand where the desk or the bed will go and check the height of the sill, the view out and where the sun patch will fall on the floor at different times of day. That is the thinking behind how we plan the light and our guide to positioning a roof window in a room. Moving a pencil mark on the plasterboard by one rafter bay costs nothing; moving a window after the roof is cut does.
Questions people also ask
Can a roof window be replaced from inside?
Yes, and a straight swap is usually simpler than a new install. The old sash and frame come out through the room, the new frame goes into the same opening, and a new flashing kit is fitted around it. Older windows sometimes need a special flashing so the internal lining can stay as it is. See our roof window installation page for how replacements are planned.
Do the neighbours need to know if the work is done from inside?
Not because of the access. Where no scaffold is needed on their side and the window is well away from the party wall, the work is contained on your roof. A window close to a party wall is a different matter, because fire rules keep glazing out of the zone either side of it.
Will fitting from inside damage the ceiling below?
The lining is cut to a marked line, so the disturbance is limited to the opening itself. The reveals are then built out and finished as part of the job, leaving a clean edge ready for decoration.
Can you fit a roof window from inside in bad weather?
The inside work can carry on, but the roof is only opened when there is a dry spell long enough to get the frame in and the flashing on. If rain arrives early, the opening is sheeted over until it clears. When you are ready, book a light survey and we will look at the slope, the covering and the room together.