Question

When should a skylight be planned in an extension?

The short answer

Plan the skylight at design stage, while the extension is still on paper and before the structural calculations and the roof build-up are fixed. That is when the opening can be framed in, the steels and joists set around it, and the rooflight placed where the sun will actually land in the room. Leave it until the roof is on and you are fitting around decisions already made.

Why the drawing board is the right moment

A rooflight is a hole in the structure, so it belongs in the same conversation as the steels, the joists and the ceiling line. Once those are calculated and ordered, the skylight has to fit the gaps they leave.

On a single-storey rear extension to a 1930s semi in Cherry Hinton or a gault brick terrace off Mill Road, the engineer sizes the joists, any steel beam over the new opening into the house, and the trimmers that carry load around a hole in the roof. If the rooflight is drawn in from the start, the trimmers are designed for it and the joist layout can run to suit a sensible opening size. If it arrives later, the choice is often a smaller unit that fits between existing joists, a position dictated by where the timber happens to be, or fresh calculations and extra cost.

The roof build-up matters just as much. A warm deck flat roof sets the insulation depth, the falls and the height of the finished surface, and a flat rooflight needs a kerb that stands clear of that surface, commonly at least 150mm above the finished roof. A roof lantern needs its upstand sized for its span. Those heights affect parapet levels, the fascia and, where there is a neighbour close by, how the extension reads from next door. Drawing them once, together, is simpler than redrawing them.

What the plans should settle

A good set of extension drawings answers a handful of skylight questions before anyone orders timber. None of them is complicated on paper; all of them are awkward to change on site.

  • Type and size: flat rooflight, lantern or pitched roof window, and the structural opening each needs. Our types of rooflight guide sets out the job each does.
  • Position in the room: over the kitchen island, along the back of a deep plan, or close to the old rear wall where the house is darkest.
  • The shaft or reveal: how deep it is, and whether the sides are splayed to spread the light.
  • Glass: solar control, a laminated inner pane for overhead safety, and a U-value that meets Part L (the limiting figure for rooflights is 2.2 W/m2K).
  • Opening and power: whether the unit opens for ventilation, and whether a cable run is needed for an electric opener or rain sensor.
StageEasy to changeHard to change
Concept drawingsSize, position, typeVery little
Structural calcs doneGlass, opener, blindOpening size, position
Roof onBlind, controlsAlmost everything else

Reading the Cambridge sun before the plans are signed

Where the light lands depends on where the sun is, and in Cambridge the noon sun climbs to only about 14 degrees above the horizon in late December, about 38 degrees at the equinoxes and about 61 degrees in late June. Those three angles are worth checking against the drawings.

At 61 degrees a midsummer sun comes steeply down through a flat rooflight, so the bright pool sits close under the glass. Put that over a dining table and it is a pleasure; put it over a hob or a worktop where someone stands at lunchtime and it is glare and heat. In winter, at 14 degrees, the sun barely clears the house to the south and the rooflight mostly delivers sky light rather than direct sun. That is often exactly what a deep kitchen needs, but it means position matters more than size.

The orientation of the extension shapes this too. A north-facing rear extension gets soft, even skylight light all year with little glare, while a south-facing one needs its glass and blinds chosen with summer heat in mind. The skylight orientation guide goes through each slope, and our light planning page shows how we map the seasons onto a room. Doing that on the plan costs nothing; moving a finished rooflight costs a great deal.

Planning and Building Control, in outline

The approvals tend to follow the extension rather than the skylight, which is another reason to settle the rooflight early: it should appear on whatever drawings go to the council and to Building Control.

A rear extension may fall within permitted development or may need planning permission, depending on its size, the house type and any local restrictions such as a conservation area or an Article 4 direction. If an application is needed, the rooflights are usually shown on it, and a lantern that looks bulky from a neighbour's garden can attract comment. Our guide to rooflight planning permission covers the Cambridge councils in more detail, and the local planning authority, for most of the area Greater Cambridge Shared Planning, is always the final word.

An extension is normally notifiable building work, so the rooflights usually sit within the extension's Building Control application rather than needing one of their own. The inspector will be interested in thermal performance, safety glazing, structure around the opening and, on side-return extensions, fire: a rooflight generally should not sit within 1500mm either side of a party wall. The Building Regulations for rooflights guide explains each part. Requirements vary by project, so treat this as orientation rather than a ruling on your scheme.

If the extension is already under way

Late is not the same as too late. It simply narrows the choices, and the sooner the question is raised, the more of them are still open.

If the joists are up but the deck is not, an opening can often still be trimmed in with the engineer's agreement. If the roof is finished, a flat roof rooflight can still be added, though it means cutting the new covering and forming a kerb, and the position is steered by the joists. A roof lantern on a finished roof is the biggest change of all, as its span usually needs the structure reconsidered. For the design ideas themselves, from side returns to wraparounds, see skylight ideas for extensions; this page is only about timing.

Questions people also ask

Should the rooflight be ordered before the roof is built?

The size and type should be fixed before the roof is framed, so the opening matches the unit. Many rooflights are made to order, so it helps to check lead times against the build programme and confirm the exact structural opening with the supplier first.

Can the architect and the rooflight installer work together?

Yes, and it helps. We can look at the drawings, visit the house and give a written light plan showing the position, size and glass we suggest, so the designer and engineer can build it into the scheme. Book a light survey or message us on WhatsApp.

Is a bigger skylight always better in an extension?

No. Beyond a point, extra glass brings glare, summer heat and heat loss rather than useful light. Our answer on whether a skylight can be too big for a room covers the warning signs.

Does a builder usually fit the rooflight?

Arrangements vary. Some builders fit it, others bring in a specialist for the unit, the kerb and the weathering. Either way, the position and specification should be on the drawings first, which is the heart of skylight and rooflight installation done well.