Guide · Misted and failed rooflight replacement

Replacing Rooflights During a Reroof

A reroof opens the roof, puts up the access and renews every junction. It is the natural moment to replace tired rooflights and skylights, and to put the light where the room needs it.

15 min read9 chapters

Why a new roof is the natural moment for new rooflights

A reroof strips the coverings, puts up the access and renews every junction on the roof, which is exactly the work a rooflight replacement needs. Doing both together means one scaffold, one opened roof and one set of new weatherings that are designed to meet each other.

Think about what a roofer does to a rooflight that is staying put. On a pitched roof, the tiles or slates around the roof window come off, the old underlay is cut back to the frame, and the new membrane and battens are brought up to an old flashing kit that was made for the previous roof. On a flat roof, the new covering is dressed up an existing upstand and tucked under a rooflight frame that may be twenty or thirty years old. The roofer can make that work, but it ties a brand new roof to the weakest and oldest component on it.

The two also age on very different clocks. A good new roof covering is expected to last for decades. A sealed glass unit in a skylight has a working life of its own, usually quoted in the region of 20 to 30 years for a quality unit and less for older or cheaper ones. If the rooflight is already in its second decade, it is likely to need replacing well before the new roof does, and replacing it then means disturbing fresh coverings, fresh flashings and fresh internal finishes a few years after they went on. Renewing the rooflight during the reroof puts the whole roof back to the same starting point.

There is a quieter reason too. A reroof is one of the few times a house is opened up enough to rethink the light in the room below without much extra upheaval. The rest of this guide covers both: the practical case for rooflight replacement during a reroof, and the chance to get a better room out of it. If you want the background on how older units fail, our guide to misted and failed rooflight replacement in Cambridge sets out the full service.

Pitched roofs: roof windows while the tiles are off

On a pitched roof, a stripped slope gives clear access to the rafters around the roof window, so the new window, its flashing and its insulation collar can all go in as part of the new build-up rather than being worked around it.

Cambridge has a wide spread of pitched coverings. The Victorian and Edwardian terraces in Romsey, Petersfield and around Mill Road are largely slated. The 1930s semis on the city edges and in villages such as Histon and Great Shelford carry plain clay tiles or concrete interlocking tiles. Village cottages further out have handmade clay, and a few still have thatch. Each covering takes a different flashing profile. A roof window sitting in slate needs a low-profile flashing; one in a deep interlocking tile needs a profiled kit with a flexible apron that follows the tile. When the covering itself changes during a reroof, from concrete tile back to slate on a terrace for example, the old window's flashing is simply the wrong part.

With the slope open, the replacement roof window is set into the rafters at the depth the manufacturer specifies for the new roof. The underlay collar that joins the window to the breathable membrane is fitted before the battens go on, so the membrane laps onto it properly instead of being cut and taped around an old frame. An insulating collar can be packed around the frame to reduce the cold bridge at the lining, which is where older roof windows are usually coldest and where condensation tends to form on winter mornings.

The open slope also makes resizing far simpler. Widening a roof window from one rafter bay to two, or lengthening it so the view line drops within reach of a seated person, means trimming rafters. With the tiles off and the roofer on site, that trimming is ordinary carpentry done in daylight from the scaffold. Done later, on a finished roof, it means stripping tiles again. Where a pitched roof in a loft room needs a larger window for escape or for a better view out, the reroof is the cheapest point at which to make that change. The details of changing size are covered in our answer on whether a replacement rooflight has to be the same size.

Flat roofs: the new build-up changes the upstand

On a flat roof, a new covering nearly always sits higher than the old one once the insulation is upgraded, and that extra height is what makes the existing rooflight upstand too short to keep.

A rear extension from the 1970s or 1980s might have a thin layer of insulation, or none, under a felt covering. When that roof is replaced in full, the Building Regulations generally expect the insulation to be brought up to the current standard where that is technically and economically sensible. In practice that means a warm roof with a much thicker layer of insulation board over the deck, then the new waterproofing on top: single ply, EPDM, GRP or a torch-on system. The finished roof surface can rise by 100 to 150mm, sometimes more.

Flat rooflights, domes and lanterns all sit on an upstand or kerb. Trade guidance asks for the top of that upstand to finish at least 150mm above the finished roof surface, so rainwater and standing water cannot reach the joint between frame and kerb. Raise the roof and the old upstand falls short. The roofer then has two choices: build the old kerb up with packers and dress the new covering over a mix of old and new timber, or remove the rooflight so the kerb can be rebuilt at the right height. Once the rooflight is off for the kerb to be rebuilt, putting the old unit back on is rarely the sensible choice.

Section through a flat-roof rooflight: joists and trimmers, deck, insulation laid to falls, a kerb at least 150mm above the finished roof with the membrane dressed over it, the rooflight unit and a plastered reveal.150mm1:4012345678
Fig. Section through a flat-roof rooflight on a warm-deck roof, drawn at about 1:20.
  1. Joists, with doubled trimmers either side of the opening to carry the loads of the cut joists around it.
  2. Deck (usually 18mm ply or OSB) with a vapour control layer laid on it.
  3. Insulation boards above the deck (a warm roof), often tapered to give the roof its falls.
  4. Waterproof membrane dressed up the upstand and over its top, so the joint is lapped, not sealed.
  5. Upstand, or kerb: insulated timber, finishing at least 150mm above the finished roof surface to keep standing water and splash off the joint.
  6. Rooflight unit fixed over the kerb, its frame skirt shedding water outside the membrane turn-up.
  7. Plastered reveal lining the opening from the ceiling up to the frame, finished white to bounce the light down.
  8. Roof falls to an outlet: designed at about 1:40 so the finished roof never falls less than 1:80.

The rebuilt kerb is also the moment to set its size for the new unit. Old flat skylights and domes were often made to odd sizes, and a modern flat glass rooflight or lantern may be made to measure or chosen from a standard range. Building the kerb to suit the new unit, with a slight fall on the glass so rain runs off, gives a cleaner result than adapting a modern frame to a kerb built for something else. Our guides on replacing an old flat rooflight and replacing a failed roof lantern cover the unit choices in more detail.

Planning the light before the roofer's programme is fixed

The best time to decide where the new rooflight goes, how big it is and what glass it carries is before the reroof is booked, because those decisions change what the roofer builds.

A reroof puts the old skylight's position back on the table. That position was usually chosen by whoever built the extension or converted the loft, often to suit a rafter spacing or a joist run rather than the room. A rooflight centred over a kitchen worktop on a south-facing extension, for example, might put a hard sun patch across the chopping board from late morning to mid afternoon in summer, while the dining table at the far end of the room stays dim. Moving the opening by a metre along the joists could put the light over the table and keep direct sun off the work surface.

Orientation matters as much as position. On Cambridge's flat, open ground there is very little high land or tree cover to shade a roof, so a south-facing slope takes the full arc of the sun. A replacement roof window on that slope benefits from solar control glass and an external awning blind. On a north slope, clear low-iron glass with a good low-E coating gives the most useful daylight without heat build-up. East and west slopes bring low sun and glare at the start and end of the day, which matters for a bedroom or a home office with a screen. Our light planning page explains how we map the sun path over a roof and turn it into a position, size and glass choice.

Every quote we give comes with a written light plan: the position, size, glass and shading of each rooflight, and the reason for each. For a reroof, that plan is also a set of instructions for the roofer: which rafters or joists are trimmed, where the new kerb sits, and how big the opening is. If you are considering a move, our guide to repositioning a rooflight when replacing it goes through the structural side.

How the roofer and the rooflight installer work together

A reroof with new rooflights has two sets of skills on one roof, so the sequence, the responsibilities and the point where one trade's work meets the other's need agreeing in writing before anyone starts.

The usual order runs like this. The survey and light plan come first, so the rooflight sizes and positions are known when the roofing work is priced. The new units are ordered early, because made-to-measure flat glass rooflights and lanterns can take several weeks to manufacture, and a roofer should not be left with an open roof waiting for glass. The roofer strips the coverings. The opening is trimmed or the kerb rebuilt to the agreed size. The rooflight or roof window goes in. The roofer then brings the new covering, membrane and flashings to it. Inside, the lining, insulation and plaster around the opening are finished last.

StageRooferRooflight installer
Before workPrices the roofLight plan, sizes, order
Strip outRemoves coveringsRemoves old unit
OpeningDeck and insulationTrims, kerb, fits unit
WeatheringDresses covering to unitFlashing kit, frame seals
InsideNoneLining and making good

The line that matters most is the weathering junction. On a flat roof, the roofer's membrane runs up the kerb and the rooflight frame sits over it. On a pitched roof, the roof window's flashing kit sits over the tiles or slates and under the course above. Whoever does each layer, both trades need to know who owns that junction and who is answerable for it. Our 10-year workmanship guarantee covers our installation work, including the fitting of the unit and its flashing kit. The roofer's own guarantee covers the roof covering. Agreeing that boundary at the start means there is never a question later about whose work is whose.

We can work alongside a roofer you have already chosen, or fit the rooflights as part of a coordinated programme with the roofer on site. Either way, the light plan is shared with the roofer before the strip begins, so the kerb heights, opening sizes and flashing types match the new units exactly.

Scaffold, weather and keeping the house dry

A reroof already needs full access, so the rooflight work uses the same scaffold, and the timing of the strip is planned so no opening stays uncovered overnight.

On a two-storey terrace or semi, the roofer's scaffold gives a safe working platform along the eaves and, with a roof ladder or crawl boards, up the slope to the roof window. On a single-storey rear extension, a tower or low scaffold is often enough. Sharing that access is one of the plainest savings in doing both jobs at once: access is a real part of the cost of replacing a rooflight on its own, as our answer on whether replacing a rooflight needs scaffolding explains.

East Anglia is one of the drier parts of the country, but a Cambridge spring still brings showers that arrive fast over the flat land. On a pitched roof, the slope around the roof window is stripped in sections, and the new window is fitted and flashed the same day. On a flat roof, the old unit comes off only when the new kerb and the new unit are ready to go on, and any exposed opening is sheeted and battened down at the end of each working day. Timing the rooflight work to the roofer's day matters here: there is no benefit in opening the roof in the morning if the new unit cannot be fitted until the afternoon of the next day.

Building Control, planning and conservation areas

Replacing a roof covering and replacing a rooflight can both bring Building Regulations into play, and in a conservation area the look of the new roof and the new skylights can matter for planning too.

In England, re-covering a large part of a roof, generally more than a quarter of it, is treated as renovating a thermal element under Part L. That is usually the trigger for the insulation upgrade described above, and the work is normally notified to Building Control, either by the roofer or through an application. A replacement rooflight is also expected to meet the current thermal standard: Part L sets a limiting U-value for rooflights of 2.2 W/m2K, assessed in the horizontal plane, and a modern double or triple glazed unit will comfortably beat that. Where the rooflight work is notifiable, we handle the Building Control notification for it. The detail is set out in our guide to Building Control for replacement rooflights.

Planning permission is not normally needed to reroof a house in similar materials, and a like-for-like rooflight replacement usually needs none either. Changes are where it gets more careful. A bigger opening, a new rooflight on a slope facing the street, a unit that projects more than 150mm above the roof plane, or a change of covering material may need thinking about, particularly in a conservation area. Greater Cambridge Shared Planning covers both Cambridge City and South Cambridgeshire, and the city alone has 18 conservation areas; some streets also have Article 4 directions that remove permitted development rights for roof changes. On a listed building, any change to the roof or its rooflights needs listed building consent. Our answers on planning permission to replace a rooflight and like-for-like replacement in a conservation area cover the specifics. A reroof in a conservation area is a good time to upgrade an old stepped-profile roof window to a flush conservation rooflight, which sits lower in the slope and is often better received by conservation officers.

Inside the room when the work is done

The internal side of a rooflight replacement is finished after the roof is weathertight: new linings, insulation around the frame, and plaster made good to the ceiling so the room is ready to decorate.

On a pitched roof, a replacement roof window of the same size can often be fitted without touching much of the lining, but a resized or repositioned window needs new plasterboard linings to the reveals. Splaying the bottom lining towards the floor and keeping the top lining horizontal spreads the daylight further into the room, which helps in a deep loft room where the window is set back behind the knee wall. On a flat roof, the rebuilt kerb means a new lined reveal between the ceiling and the underside of the rooflight. The deeper that reveal, the more the light is channelled, so a flat roof with a thick new warm deck benefits from a reveal that is splayed or finished in a pale, matt colour.

Our answer on whether replacing a rooflight will damage your ceiling goes through what is disturbed and how it is made good. The old units are taken away at the end of the job. When the scaffold comes down, the roof is new, the rooflights are new, and the light in the room is where the plan said it would be.

Questions people ask

Can I keep my existing rooflights and replace them later?

You can, and a roofer can work around a sound unit. The question is whether the rooflight will outlast the new roof. If the sealed units are already misted, the frame is cold or the upstand will fall short once the insulation is upgraded, keeping them means a second opening of the roof within a few years. If the units are recent and the kerb height works with the new build-up, keeping them can be reasonable.

Does replacing rooflights during a reroof cost more overall?

The rooflights themselves cost the same, but the combined job avoids a separate scaffold, a separate strip of the coverings and a separate round of making good. Our costs page sets out what drives the price of rooflight and skylight work, and a survey gives the real figure for your roof.

Should the roofer supply the rooflights?

A roofer can order a stock unit, but a rooflight chosen for the room needs its position, size and glass decided against the orientation and how the room is used. We specify and supply the units as part of the light plan and share the kerb and opening sizes with the roofer, so the roof is built to suit the unit rather than the other way round.

Can a new rooflight be added during the reroof as well?

Yes. A reroof is the simplest time to add a skylight over a dark landing, a second roof window in a loft room or a rooflight over a deep kitchen. The same planning and Building Control points apply, and the light plan covers the new opening alongside the replacements. To start, book a light survey or message us on WhatsApp before the roofing dates are fixed.

Book a light survey

Tell us about the room

  • No obligation
  • Light plan in writing
  • 10-year guarantee
Book a survey Call