How high should a flat rooflight upstand be?

The short answer

A flat rooflight upstand should stand at least 150mm above the finished roof surface, measured at its lowest side after every layer of covering, insulation and ballast is in place. That figure comes from UK flat roofing guidance and the rooflight makers' own fitting instructions. A taller kerb, often 200 to 300mm, makes sense on green roofs, gravel roofs, behind parapets and wherever water or snow can build up.

Where the 150mm is measured from

The 150mm is clear height above the top of the finished roof, not above the joists, the deck or the insulation boards. Get the reference point wrong and a kerb that looked right on the drawing ends up too low once the roof is finished.

A flat roof is a stack of layers. On a typical Cambridge rear extension you might have joists, a timber deck, a vapour control layer, 120 to 150mm of rigid insulation, a second deck in some systems, then the waterproof membrane. If the kerb is set out against the deck before the insulation arrives, it can lose most of its height the moment the boards go down. The number that matters is the gap between the membrane surface and the top of the upstand where the rooflight frame sits.

Measure at the lowest corner. A flat roof is never truly flat: it falls towards a gutter or outlet, often at a gradient of around 1:40 or steeper. On a rooflight 2 metres long that fall alone can take 25 to 50mm off the height on the downhill side. We set out the kerb so the downhill edge still clears 150mm, which usually leaves the uphill edge taller. The guide to flat rooflight upstands covers how the kerb is built; this page is about the height.

Section through a flat-roof rooflight: joists and trimmers, deck, insulation laid to falls, a kerb at least 150mm above the finished roof with the membrane dressed over it, the rooflight unit and a plastered reveal.150mm1:4012345678
Fig. Section through a flat-roof rooflight on a warm-deck roof, drawn at about 1:20.
  1. Joists, with doubled trimmers either side of the opening to carry the loads of the cut joists around it.
  2. Deck (usually 18mm ply or OSB) with a vapour control layer laid on it.
  3. Insulation boards above the deck (a warm roof), often tapered to give the roof its falls.
  4. Waterproof membrane dressed up the upstand and over its top, so the joint is lapped, not sealed.
  5. Upstand, or kerb: insulated timber, finishing at least 150mm above the finished roof surface to keep standing water and splash off the joint.
  6. Rooflight unit fixed over the kerb, its frame skirt shedding water outside the membrane turn-up.
  7. Plastered reveal lining the opening from the ceiling up to the frame, finished white to bounce the light down.
  8. Roof falls to an outlet: designed at about 1:40 so the finished roof never falls less than 1:80.

Why the minimum is 150mm and not less

The height exists to keep water away from the joint between the rooflight frame and the roof covering. Rain, splash, standing water and melting snow all attack that line, and 150mm is the point at which the membrane turn-up is considered safe.

Roofing guidance from the NFRC and the single-ply trade body (SPRA) treats 150mm as the minimum upstand height for any flat roof detail, whether it is a wall abutment, a rooflight kerb or a vent. The membrane is dressed up the face of the kerb and terminated under the rooflight frame or a capping. Below 150mm, heavy rain bouncing off the roof surface can reach the top of the dressing, and a blocked outlet can let water pond above it.

Most rooflight manufacturers write the same figure into their installation instructions, and a unit fitted on a lower kerb may fall outside the product warranty. So the minimum is not only good practice; it is usually a condition of the rooflight you are buying.

When a taller upstand makes sense

A taller kerb is the right call whenever the roof surface can rise above the membrane, or water and snow can gather against the rooflight. The table below is a guide to typical clear heights; the survey sets the real figure for your roof.

Roof situationTypical clear height
Membrane roof, good falls150mm
Gravel or paving ballast150mm above the ballast
Sedum or green roof150mm above the growing layer
Behind a parapet200 to 300mm
Future overlay insulation planned150mm plus the new layers

Green roofs are the clearest case. The substrate and plants add 80 to 150mm on top of the membrane, and the 150mm is taken from the top of that growing layer, with a gravel margin around the kerb. The answer on green roof rooflights goes through the margin and drainage.

Parapet roofs are the second. A roof enclosed on three sides by brick upstands collects snow drift and, if an outlet blocks, can hold water like a tray. Lifting the kerb gives a wider margin before anything reaches the frame. See rooflights on parapet roofs for the drainage side of that.

A third case is a roof that will be upgraded later. If you plan to add overlay insulation to an older cold deck, build the kerb tall enough now so it still clears 150mm after the new boards and membrane go on. Otherwise the rooflight has to come out again.

What a taller kerb does to the light

Every extra 100mm of kerb deepens the shaft the light has to travel down before it reaches the room. On a small rooflight that noticeably narrows the angle of sky the room can see.

The internal reveal is the upstand height, plus the rooflight frame, plus the full depth of the roof build-up and the ceiling. On a warm deck extension that can reach 400 to 600mm in total. Straight-sided, that reveal acts like a short tunnel: high summer sun comes straight down, but low winter light from the south strikes the sides of the shaft and never reaches the floor. For more on how the unit itself adds to that depth, read how thick a flat rooflight is.

This is why the height is part of the light plan, not only the roofing detail. On a north-facing side return in a Romsey terrace, where the rooflight is the room's only daylight, we keep the kerb at the minimum the roof allows and put the extra effort into the reveal. On a south-facing roof at Trumpington Meadows, a slightly deeper shaft can help, because it trims the steepest summer sun before it lands on the worktop.

Upstand height, pitch and planning

The kerb also sets the fall on the glass, and on an existing house its height can matter for permitted development. Both are worth settling before the roof is opened.

Flat glass needs about 5 degrees of fall so rain clears it. Some units have that fall built into the frame; others rely on a kerb that is taller on one side. On a 1 metre wide rooflight, 5 degrees means roughly 90mm between the high and low sides, and the low side still has to clear 150mm. The answer on minimum pitch explains how that is achieved.

On planning, permitted development rules for roof alterations to an existing house generally limit how far a rooflight can project above the roof plane, commonly read as 150mm. How a council treats the kerb within that projection is not always consistent, and conservation areas and listed buildings bring their own limits, so a tall upstand on a visible roof is worth checking first. Our answer on whether a flat rooflight needs planning permission sets out the usual position. A rooflight added as part of a new extension is normally considered alongside the extension itself.

Questions people also ask

Can a flat skylight upstand be lower than 150mm?

Not on a standard flat roof detail. Some specialist walk-on and flush systems use a sunken drainage channel instead of a kerb, but they are designed as a complete system with their own outlet. For a conventional flat skylight, 150mm above the finished surface is the floor, and we would not fit below it.

Does the upstand height change on a lead or zinc roof?

The 150mm clearance still applies, but the kerb is weathered with a metal upstand and a separate cover flashing rather than a dressed membrane. The detail is set out in rooflights on lead and zinc roofs.

Is a factory upstand the same height as a timber kerb?

Factory insulated upstands come in set heights, often around 150 to 300mm, and are ordered to suit the roof build-up. A timber kerb is built to any height on site. Either works if the finished clearance reaches 150mm and the insulation line is continuous, which matters on a warm deck flat roof.

Who decides the upstand height on my roof?

We do, at the light survey, after measuring the roof build-up, the falls and the covering. The height goes into the written light plan with the position, size and glass. You can read more about the whole service on our flat roof rooflight installation page, or book a light survey.

Book a light survey

Tell us about the room

  • No obligation
  • Light plan in writing
  • 10-year guarantee
Book a survey Call