Question

How long does skylight replacement take?

The short answer

As a general guide, a like-for-like skylight replacement in a pitched roof typically takes half a day to a day on site, because the opening, rafters and inside lining already exist. A same-size flat rooflight on a sound kerb is usually similar. Upsizing changes the job: a bigger rooflight typically needs one to three days, as the roof opening, framing and finishes all have to be rebuilt.

Like-for-like replacement: usually the quickest roof job there is

When the new skylight is the same size as the old one and goes in the same hole, the work is mostly swapping one frame for another. The structure is already there, so the time goes on careful removal and weathering.

For a pitched roof window, the sequence is short. The old sash comes out from inside, the tiles or slates around the frame are lifted, the old flashing and frame are unscrewed, and the new frame drops into the same rafter opening. A new flashing kit and underlay collar are fitted, the tiles are relaid, and the inside lining is checked and made good where the old frame met it. Manufacturers quote around four hours for a straight swap of one of their own windows, and that is a fair picture of a clean job. Allow the rest of the day for tidying the reveal, fitting a blind and clearing dust sheets.

On a flat roof, a rooflight that sits on an existing upstand can often be lifted off and a new one fixed down in a morning, provided the kerb is the right size, level and dry. The waterproofing around the upstand is then dressed back up to the new frame. If you are not sure what you have, our answer on how to identify an existing skylight explains where to find the make, size code and glazing details that decide whether a like-for-like swap is possible.

Upsizing adds days, not hours

A bigger rooflight means a bigger hole, and a bigger hole means structural, weathering and plastering work that a straight swap avoids. Typically this puts the job at one to three days.

In a pitched roof, going up a size usually means cutting one rafter and trimming the opening with new timbers, then extending the tiling battens, fitting the larger flashing and building a new, wider lining inside. The ceiling is cut back further and the new reveal is insulated, boarded and skimmed. Plaster needs time before decoration, so the room is usable within a day or two but may want painting a week later. On a flat roof, a larger rooflight needs a new kerb, a wider cut through the deck and a proper reinstatement of the membrane around it, which is weather-sensitive work. A replacement lantern on an orangery or kitchen extension sits at the long end of the range because it is assembled on site bar by bar.

Upsizing is also where the light changes most, so it is worth planning rather than guessing. A larger pane on a south slope gives more winter light but also more summer heat and glare; on a north slope it gives softer, steadier light with little heat penalty. Our orientation guide covers what each slope gives the room, and can you replace a skylight with a bigger one covers the structure and approvals in more detail.

What makes a replacement run longer than expected

The unknown in any replacement is what the old rooflight has been sitting in. Conditions hidden under the old frame, rather than the new unit, decide whether the job runs to the top of its range.

  • The kerb or upstand. A timber kerb that is soft, out of level or too low for today's 150mm minimum upstand has to be rebuilt before a new rooflight can go on it.
  • Older roof windows. Windows made before about 2001 often need a specific replacement flashing so the new frame sits at the right depth without disturbing the inside lining. Having the right kit on the van saves a return visit.
  • Roof covering. Slate and small plain clay tiles, common on Victorian terraces around Mill Road and Romsey, take longer to lift and relay cleanly than large concrete tiles.
  • Access. A rear slope over a narrow side return may need scaffold or a tower rather than ladders, which adds a setting-up visit but not usually a fitting day.
  • Weather. Opening a roof needs a dry window. Rain on the day moves the start rather than lengthening the job once it begins.

A survey before the quote is what takes these off the table. Our guide to the rooflight replacement process walks through what is checked and when.

The weeks either side of the fitting day

Time on the roof is only part of the calendar. Measuring, ordering and any approvals typically add a few weeks before work starts.

StageTypical timeNotes
Survey and light plan1 visitMeasure, check kerb, agree glass
Standard unit lead time1 to 3 weeksStock sizes and glazing
Made-to-measure unit3 to 6 weeksLanterns, frameless, conservation
Fitting, like for likeHalf a day to 1 daySame opening
Fitting, upsized1 to 3 daysNew opening and lining

These are general ranges, not a promise for any particular roof. Replacement roof glazing has to meet the current thermal standard in Part L of the Building Regulations, and the work can be notifiable; where it is, we handle the Building Control notification, which does not normally hold up the fitting date. A like-for-like replacement on a house does not usually need planning permission, but a larger rooflight in a conservation area, on a listed building or on a flat needs checking first. The building regulations guide sets out which parts apply.

How long the room is out of use

For a like-for-like swap, the room underneath is typically back in use the same evening. An upsized rooflight usually leaves a day or two of plaster drying and one more visit for decoration.

The roof is never left open overnight on a planned job: the old unit stays in place until the new one is ready to go in, and anything opened is weathered before the trades leave. Furniture under the opening needs moving and covering, and a bedroom or home office below a loft window is best cleared the evening before. If several rooflights are being renewed at once, a second unit of the same type in the same room typically adds a few hours rather than a whole day, because the access and dust protection are already set up. For the full list of choices, from glass-only to changing type, see skylight replacement options, or our page on misted and failed rooflight replacement if an old unit has clouded between the panes.

Questions people also ask

How long does rooflight replacement take compared with a new installation?

A like-for-like rooflight replacement is usually quicker than a new one because nothing structural changes. A new opening has to be cut, framed and lined from scratch, which is covered in how long skylight installation takes. An upsized replacement lands between the two.

Is there a best time of year to book a replacement?

Any dry spell works, and a well-planned roof opening is weathered the same day. Spring and early autumn tend to give the steadiest conditions for flat roof membrane work. Our answer on the best time of year to replace a skylight goes into lead times and weather in more detail.

Do I need to be at home on the day?

It helps to be there at the start to confirm the position and the glass, and at the end to see the finished reveal and try any opener or blind. In between, the trades need access to the room and, for a flat roof, to the roof itself.

Can the new skylight be ordered before the survey?

It is better not to. Old roof windows and rooflights vary in size codes, upstand heights and flashing types, and ordering from a guess is the usual cause of a second visit. The survey fixes the size, the glass and the light plan, and the order follows. Book a light survey to start, or read more about how we approach skylight and rooflight installation in Cambridge.